Default physical sample storage information
Hi all. We recently started using physical samples for one of our plants. We have them created when the lot is created via a sample drawing procedure set in the inspection plan. Is there a way to set...
View ArticleSource inspection and GR inspection
Dear Experts, My client's requirement is as follows,When source inspection lot is rejected, system should not create GR (GR should be blocked), and when source inspection lot is accepted then...
View ArticleCertificates with inspection results in one plant but shipped from another plant
Hi, I need to create a certificate which is inspected in one plant and shipped from another. Business case:The product is produced in plant 1, then shipped with stock transport order to plant 2 which...
View ArticleQM process flow
Hi, Can any one explain the general process flow of Qm module.I have no idea on the Qm management. Thanks. -Santhosh
View ArticleChange the inspection stock of material in QM only:Message no. QA495
Dear Gurus,We are trying to reverse a purchase order.for which MIGO has be done.let me explain in detail.In our case material was purchased and migo was done then material went into quality lot and...
View ArticleQuery in Classed recording in MIC
Dear Experts, I am trying to explore the feature "Classed recording" for an Quantitative MIC. I referred QM expert Craig's earlier post on classed recording topic. But i am having fundamental doubts in...
View Articlehow to find those inspection lot operation that have skips only
Dear SAP Gurus, How to find inspection lots operations that have skips (i.e, that is to be skipped) only. Since we want to know whether there exists a quicker method to find out which analysis have to...
View ArticleUD reversal of FG with serial number
Dear Experts, I have done GR for FG through MFBF (REM). And stock is cleared from UD also. My FG materials are serial number managed.How do I reverse the stock? SAP note - 175842 is already implemented...
View ArticleRequired Fields in SAP Notification
When creating a new Notification, we have multiple tabs. Some fields is marked as required. When you are on the first screen, the system will warn you that you must still populate fields in other tabs....
View ArticleAutomatic Task Determination in Notifications.. problem
Recently we implemented the process for automatic task determination in QM Notification explained in this instruction: Automatic Task Determination in Notifications Everything worked as expected....
View ArticleResult Recording-Inspection Points
Hi, I am trying to work with inspection points.When I try to perform result recording for the inspection lot, I get the following error."Characteristic results cannot be recorded for Inspection Lot"...
View ArticleError in PO due to QM Procurement Key
Hi All, When i am trying to create a PO from PR,it is giving error message that " Define QM Procurement Key(material) ". Please let me know how to define QM Procurement Key for the material...
View ArticleAutomatic pop-up for defect recording if result recording of MIC is reject
Hi all, During result recording recording if MIC is reject we want automatic pop-up for defect recording.Above setting already existing for MIC.I checked setting in Catelog profile, cofirmation...
View ArticleQM inspection for movement 321 and 322
Dear guru, Presently there is one new requirement from our business wanting us to create an inspection type that will allow for users to use movement type 321 & 322 through MIGO. Because the...
View ArticleAutomatic Task Determination in Notifications.. problem
Recently we implemented the process for automatic task determination in QM Notification explained in this instruction: Automatic Task Determination in Notifications Everything worked as expected....
View ArticleChange the inspection stock of material AAAA in QM only
Dear SAP Experts, I am facing an issue . WE use inspection lot origin 05 against rejection of production order. Once lot has been cleared. Later on from customize program , we reverse this lot. Now...
View ArticleError in PO due to QM Procurement Key
Hi All, When i am trying to create a PO from PR,it is giving error message that " Define QM Procurement Key(material) ". Please let me know how to define QM Procurement Key for the material...
View ArticleCertificates with inspection results in one plant but shipped from another plant
Hi, I need to create a certificate which is inspected in one plant and shipped from another. Business case:The product is produced in plant 1, then shipped with stock transport order to plant 2 which...
View ArticleDMR is not working
Hi Experts, Issue - Dynamic Modification Rule is not working. Details Scenario:- DMR Level - 3 Dynamic Modification at Char. level Only one operation in inspection plan.Two characteristics are assigned...
View Articlefunction module: get/set paramter id
Hi togehter, i would like to use the activity task list in qm notification (behind is a function module) to start an other transaction. That works fine so far but i would us some paramter id's from the...
View Article