Source inspection and GR inspection

Dear Experts,

          My client's requirement is as follows,

When source inspection lot is rejected, system should not create GR (GR should be blocked), and when source inspection lot is accepted then system should create inspection lot after GR of that material ( Inspection lot type 01). we are using control key 0001, what settings i am missing, help needed urgently, thanks in advance