Quantcast
Channel: SCN : Popular Discussions - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 1486

DMR is not working

$
0
0

Hi Experts,

 

Issue - Dynamic Modification Rule is not working.

 

Details Scenario:-

 

DMR Level - 3 Dynamic Modification at Char. level

 

Only one operation in inspection plan.

Two characteristics are assigned to operation.

10 FA

20 SRI

 

We are not using sampling procedure.

 

Please find below DMR setting.

 

DMR - FA1 (assigned to char. FA)

DMR - CL1 (assigned to SRI)

 

FA1

 

Dynamic Modification - For usage decision

 

Stage

InspSev

Skip

Ist

Short text

Stc

  1. No. of inspection
  2. Max. Skip Duration

New Stage

Rejection

New insp. stage

1

1

N

Y

FA

Y

1

2

1

1

2

Y

N

SRI

Y

30000

455

2

1

1

 

 

 

 

Issue: The stage change is not happening for FA1 DMR when I receive a second lot from same vendor.

 

Quality levels are not updating if I check in QDL3. Lot number and UD code is not updating in QDL3.

Lots w/o usage decision is updating as all the lots are already has status UD.

 

First char. has to skip as per DMR for second lot once the UD is done for first lot.

 

I have not rejected any characteristic in RR.

 

The lots are for same vendor.

 

Please find the attachment for UD status once UD is recorded.

 

Thanks in advance.


Viewing all articles
Browse latest Browse all 1486

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>