Hi all,
I'm actually working on inspection lot for production Order (inprocess). I'm only interessed by the computation of the dynamic sample size for the production order: For example If the material is controlled 5 times without problem, he goes to reduced inspection ... .
Thanks to your forum and tutorial like this one , i have already understand lot of things. Howerver, i found nothing for a sample procedure with dynamic modification rule.
To rich my goal i have to :
-MM02: quality management , assign inspection type Y03
-QS21 : create a Master Inspection Characteristic (in my case a qualitative: Accepted/rejected)
-QDV: Create a sampling procedure. As i want my sampling procedure to be dynamic , i have to link it with a sampling scheme (QDP1) and a dynamic modification rule (QDR1).
-CA02: modify the routin of the material. modify control key of operation "inspection" to YP04 and assign my MIC and my sampling procedure to this operation.
-coois: release my production order. Insp. lot create automaticly.
-QA32: Save the result in usage decision. ( i dont want to create Quality Notification even if there is a non conformity), so i record nothing in "Results".
My question is very simple : Will it work ?
Is it possible to have dynamic rule for production order? Do i need a inspection plan ?
Thank you very much to help me for my first topic on this forum ![]()
I will be very happy to share a tutorial when ill do it concretely.
Marwan