Quantcast
Channel: SCN : Popular Discussions - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 1486

Skip lot across multiple batches for same material

$
0
0

Hi,

 

I am looking for a way to control skip lots across multiple batches for the same material.

 

We need to do a quality check in production after a certain quantity produced (on a machine, for a material). My idea was to do skip lots (for GR)  until we reach a threshold (say 10.000 pcs) and then do an inspection for the next GR for that material.

 

Any ideas how to set that up?

 

Thanks for any hint

Andreas


Viewing all articles
Browse latest Browse all 1486

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>