Hi,
I am looking for a way to control skip lots across multiple batches for the same material.
We need to do a quality check in production after a certain quantity produced (on a machine, for a material). My idea was to do skip lots (for GR) until we reach a threshold (say 10.000 pcs) and then do an inspection for the next GR for that material.
Any ideas how to set that up?
Thanks for any hint
Andreas