Hi All,
I am having a unique problem with one of the Inspection lot created with 04 type using MFBF
UD status shows UD ICCO SPCO , but the Inspection lot valuation in the usage decision tab is blank
Stock posting is not completed
When i try to use QA12 it says UD not done , but status shows UD done, material stuck in QI
Can not cancel material document using MF41, MIGO, MBST
Has anybody faced this problem? Iny solution to resolve this?