Hi Gurus
My client wants to default SLED date at the time of GR for the raw materials as they are not sure of the SLED from the vendor ( they are sending different COA for the same lot) and change the SLED subsequently.
What will be the impact if we default a date like 12/31/2999.
Thanks,
SS