Quantcast
Channel: SCN : Popular Discussions - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 1486

change CRTD STATUS TO REL FOR while mapping Sample Drawing Procedure.

$
0
0

Hello,

I am trying to use Physical Sample Management in SAP for Inspection

Lots with Inspection Type 04. Every time I create an inspection lot, my lot

stays in Created mode. Here's my data.

 

I created a Sample Drawing

Procedure with the following info:

Lot Container: EA

ToPartSampleNo:

1

Sample Container: PALLET

Size Factor: 1

Fixed Number: 2

 

I

 

SAMPLE SCHEME

lot size-30

sample size-29

 

c1-21

d1-22

 

also created a Sampling Procedure with the following:

Sampling Type: 300 USE SAMPLING SCHEME

Sample

Valuation Mode: 100

Inspection

Points: Sample Management

Sample Size: 3

 

I assigned Inspection Point

200 and the Sample Drawing Procedure to the header of my Inspection Plan.

 

 

 

Is there something I am doing

wrong?

lot is generated but unable to go ahead.


Viewing all articles
Browse latest Browse all 1486

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>