We had an Inspection Lot (Type 01) that was waiting for the cert to be received via (QC55). Normally, this would stay on the worklist in (QE51N) until the UD was made. This was not the case. It fell off list until manufacturing needed the parts. Can anyone tell me why this lot would have disappeared from the list without the receipt of the certificate and UD?
Thanks