We use CWBQM transaction to change inspection plan/ multipple spec. As of now we have not implemented change number functionality at inspection plan level. So we don't use change number to change an inspection plan, but because of miscommunication/misunderstanding one of user use change number to delete one of MIC from an inspection plan at CWBQM.
Now if we want to do any change to this particular plan then system force to enter change number.
Now we have requirement to change text at "material task list assignment" tab. If we do any change using change number then system create one more entry with different valid from date (change number). Here first system trigger error CZCL014 "no valid material-routing allocation exist for xxxxxx". If continue system display with one more entry which is duplicate record in MAPL and at time of save trigger runtime error.
Have you ever faced this error? How to change text in "material task list assinment tab" using change number?