Hi QM consultants,
I need your help for solving this problem. I have created inspection plans where dynamics modification is at characteristic level , so every characteristic has a specific modification rule. For some characteristics I need a rule for daily control, only the first inspection lot of the day must start in control, in the others inspection lots of the day must be skip. I have created a rule with Reset period 1 day and two stages, the first is marked as Initial Inspection stage and the second has maximum duration skip 1 day. This rule run, but go KO if i take usage decision. For example, today is 22.01.2014, and reset date in quality level is 22.01.2014, if I take an Usage Decision first of creating an inspection lot, reset date change to 23.01.2014 and so the characteristic begin skip for all day long. I ask if is possibile not change reset date with usage decision or if is possibile create an inspection rule wich is daily and run always also with usage decision. I hope it is all clear and wait your help.
Best Regards,
Massimo Fabbrini