Hi QM gurus,
I am facing an issue related to key date in the inspection specifications tab of Inspection lot.
The inspection plan for my material(inspection type - 01) is created way back on 23rd May 2013 but the operations and MIC were created on 21st July 2015.
Now, when i do GR for this material, an inspection lot is being generated but it is not showing in QE51N.
I checked the key date in the inspection lot and it is same as the material revision level date.
But the actual system should generate this key date as the current date.
This problem is coming only for this material and for all the other materials the key date is same as the inspection lot created date.
Our user wants to record the usage decision only through QE51N.
Can anyone of you suggest why this revision level is being pulled and that too for only this particular material ?!!
Thanks,
Praveen.