Dear Friends,
Actually i am working in new requirement in QM so any one please guide me
We need to do GRN against PO at that time we can maintain skip inspection lot procedure i.e 1 lot will be inspected and 5 lot's will be skipped and 7 lot will be inspected for this requirement i can maintain
in Material master: Procurement active,Auto UD,Skip allowed
Quality plan:Vendor assignment
Vendor master:Actual qm system assignment
Quality info records:existing qm sys:1299 ISO 9001,Withcert,skip,source inspection:01
Quality level (QDL1):Assignment of DMR
but my problem is while i do the GRN total lot's will be skipping
where can i do the mistake,any one can help me pls it is urgent requirement
if you feel free give mis cal to:09739426554
Thanks,
Krishna.